Design & Repairs for Various Fuels Facilities
Newburgh, New York
Stewart Newburgh Air National Guard
DATES: September 2016 – February 2018
Engaged by an Environmental Engineering Design Firm from the D.C., Maryland, and Virginia (DMV) region to deliver a dedicated Site Superintendent, Health & Safety Officer, and Quality Control Manager throughout all three design phases, in alignment with the government Phase II Engineering Planning Study of DLA-E Petroleum, Oil, and Lubricant (POL) facilities. Responsibilities included maintaining a submittal log, managing document submissions, assisting with and approving designs, and facilitating communications with subcontractors regarding submissions and project materials. During the construction phase, oversight was provided for identified deficiencies that necessitated repairs.
SCOPE OF WORK SUMMARY:
-
ENCLOSE BUILDING
-
REPAIR LOW POINT DRAINS
-
INSTALL PUMP CONTROL PANEL (PCP) ALARM
-
INSTALL FLOW SWITCHES
-
REPAIR PIPE SUPPORTS
-
SECURE PUMPS
-
SEAL MANWAY/ TANK CONNECTION JOINTS
-
REPLACE PUMP FOUNDATIONS
-
REPLACE HIGH LEVEL SWITCH
-
INSTALL SOLENOID
-
SEAL SLAB
-
INSTALL CATWALK
-
REPLACE CONTAINMENT
-
GROUND STAIRS
-
REPLACE DISPENSERS
-
REPLACE CONDUIT SEAL
-
TANK REMOVAL
-
REPAIR WATER DRAW-OFF
-
MODIFY PIPING
-
REPAIR COATING
-
REPLACE PIPE SUPPORTS
-
INSTALL PIPE SUPPORTS
-
INSTALL ISOLATION VALVES
-
REPAIR PIPING
-
INSTALL ISOLATION PADS
-
INSTALL DBB VALVES
-
INSTALL INSULATED CLAMPS
-
REPLACE PANTOGRAPHS
-
INSTALL ACCESS PLATFORM
-
REPLACE VESSELS
-
REMOVE CONTROL VALVE
-
INSTALL ISOLATION VALVES
-
REPAIR CONTAINMENT