top of page

In-Line Inspection (Pipeline Pigging) of Jet Fuel Constant Pressure Hydrant Loops

Yigo, Guam

Andersen Air Force Base  

Picture1_edited.jpg
DAR 042 - 0061 Hydrant ILI 13 May_edited.jpg
DAR 012 - 0061 Hydrant ILI 13 - Pig.jpg
DAR 011 - 0061 Hydrant ILI 12 Apr 24.jpg
DAR 051 - 0061 Hydrant ILI 22 May 24_.jpg

DATES:   April to June 2024 ​​

Contracted by an Architectural and Engineering firm to deliver professional for a project involving the cleaning and inspection of each jet fuel hydrant loop. The objective was to identify necessary repairs and upgrades to ensure compliance with Unified Facilities Criteria (UFC) guidelines and industry standards through the use of pipeline pigging.

SCOPE OF WORK SUMMARY:  

FIELD MANAGEMENT OF

  • PIPELINE INSPECTIONS (PIGGING)

  • DEVELOPMENT OF LIFT PLAN

  • TWO (2) BULK STORAGE TANK CLEANINGS

bottom of page